Header menu link for other important links
X
Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems
Mishra A.K., Shrivastava D., Tarasia D., Rahim A.,
Published in Springer
2022
Volume: 316
   
Issue: 1
Pages: 401 - 444
Abstract
This paper addresses the joint optimization model of production scheduling, work-in-process (WIP) inventory control and group preventive maintenance (PM) planning in a multi-machine system with multi-components. The objective is to obtain optimum production sequence, PM intervals and grouping of components, which minimize the total expected cost per unit time of the system. A new meta-heuristic named Jaya algorithm and two popular algorithms viz. simulated annealing (SA) and particle swarm optimization (PSO) are applied to optimize the objective function. Initially, the optimum group of components is obtained based on the integer multiples of individual PM intervals. Secondly, the job permutation sequence incorporating group PM intervals is identified with the largest order value (LOV) rule. The shift in optimum PM intervals is realized with an advanced-postpone balancing approach. Computational results reveal that the proposed integrated model along with group PM yields up to 25% cost reductions when compared to the integrated model with individual maintenance as well as 37% savings while no integration is performed. Furthermore, the performance of algorithms is evaluated with large-sized problems. The obtained results show that Jaya and SA yielded comparable results, however, PSO is least productive. Thus, the proposed approach yields better economic performance and brings more improvised solutions as compared to the conventional methods of integrated scheduling and maintenance optimization problems. © 2021, The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature.
About the journal
Published in Springer
Open Access
no
Impact factor
N/A